Del Webb Sun City Bridge

This design-build project required the design, construction, and quality assurance of a new 230' 4-span bridge over US 278 along with new roadway approaches and enhancements. The superstructure was comprised of 34' reinforced concrete flat slab end spans, 2 - 81' continuous interior spans with 48" x 42" prestressed concrete box beams, precast concrete fascia arch panels with a full brick veneer and precast artwork insets. The substructure consisted of reinforced concrete piers on 18" prestressed concrete piles with concrete block and brick veneer surrounding all of the substructure components.

Other aesthetic enhancements included faux guard houses at opposing corners, structural ornate aluminum railing, reinforced brick posts with precast concrete caps, and various precast concrete accent and artwork panels. The design and construction of the project was completed in approximately one year, including all approach work, landscaping, and lighting.

 

See All Projects

News

23 November2011

Monroe Connector/By-Pass Design-Build Contract Signed

RALEIGH — NCDOT Transportation Secretary Gene Conti and Turnpike Authority Executive Director David Joyner today signed the $367.7 million design-build contract for the Monroe Connector/Bypass to Monroe Bypass Constructors, a join ...

4 October2011

UIG Participates in "Immediate Needs Drive".

Summer 2011 LOR Immediate Needs Drive:

In an effort to give back to our community, all UIG offices and affiliated companies participated in an "Immediate Needs Drive" to benefit the Lowcountry Orphan Relief (LOR) facility. ...

1 September2011

US 78 Bridge Replacement over Edisto River

United Contractors is replacing the US 78 bridge over Edisto River near Branchville, SC. This project consists of replacing three bridges over the Edisto River and overflows. The two overflow bridges are 240' flat slab on concrete piles and the ma ...

See All News