Palmetto Commerce Parkway Phase II

Contractors was awarded the $26.5 million dollar project, which is a part of the Charleston County Transportation Sales Tax program. The three bridges on the project consisted of a 100' concrete flat slab bridge, a 100' single span prestressed concrete bulb-tee beam bridge and a six span, 540' long prestressed concrete bulb-tee bridge. All bridges are founded on pile bents. This project was completed with their affiliate engineering companies Triplett-King and Coleman-Snow Consultants.

 

See All Projects

News

23 November2011

Monroe Connector/By-Pass Design-Build Contract Signed

RALEIGH — NCDOT Transportation Secretary Gene Conti and Turnpike Authority Executive Director David Joyner today signed the $367.7 million design-build contract for the Monroe Connector/Bypass to Monroe Bypass Constructors, a join ...

4 October2011

UIG Participates in "Immediate Needs Drive".

Summer 2011 LOR Immediate Needs Drive:

In an effort to give back to our community, all UIG offices and affiliated companies participated in an "Immediate Needs Drive" to benefit the Lowcountry Orphan Relief (LOR) facility. ...

1 September2011

US 78 Bridge Replacement over Edisto River

United Contractors is replacing the US 78 bridge over Edisto River near Branchville, SC. This project consists of replacing three bridges over the Edisto River and overflows. The two overflow bridges are 240' flat slab on concrete piles and the ma ...

See All News