I-520 Palmetto Parkway, Phase II

UIG was chosen by the SCDOT to construct a 5.5 mile grade separated divided parkway extension w/6 miles of side roads/ramps and 5 interchanges, 4.5M cubic yards earthwork, 200K square yards concrete pavement, 250K tons asphalt pavement, 140K square feet retaining walls, culverts, noise walls, and 12 interchange/overpass/underpass bridges totaling 2,280 linear feet/121,000 square feet with major woven interchange at I-20 and US 25. (Delivered on schedule in 36 months with no claims). Triplett-King provided project management, bridge design and CEI services for this project. Coleman-Snow provided roadway design and utility coordination services.

 

See All Projects

News

23 November2011

Monroe Connector/By-Pass Design-Build Contract Signed

RALEIGH — NCDOT Transportation Secretary Gene Conti and Turnpike Authority Executive Director David Joyner today signed the $367.7 million design-build contract for the Monroe Connector/Bypass to Monroe Bypass Constructors, a join ...

4 October2011

UIG Participates in "Immediate Needs Drive".

Summer 2011 LOR Immediate Needs Drive:

In an effort to give back to our community, all UIG offices and affiliated companies participated in an "Immediate Needs Drive" to benefit the Lowcountry Orphan Relief (LOR) facility. ...

1 September2011

US 78 Bridge Replacement over Edisto River

United Contractors is replacing the US 78 bridge over Edisto River near Branchville, SC. This project consists of replacing three bridges over the Edisto River and overflows. The two overflow bridges are 240' flat slab on concrete piles and the ma ...