Route 288 Bypass

United provided construction and engineering services for this public facility with 25 bridges along new 17.5-mile four-lane grade-separated divided highway. Contract scope included planning, public hearings, public relations, permitting, right-of-way coordination, utility coordination, design, construction, and long-term warranties. Bridges totaled 15,170 LF and 737,000 SF with twin 3660' crossings over James River/Norfolk Southern RR and a tri-level interchange at I-64 with 252'.

 

See All Projects

News

23 November2011

Monroe Connector/By-Pass Design-Build Contract Signed

RALEIGH — NCDOT Transportation Secretary Gene Conti and Turnpike Authority Executive Director David Joyner today signed the $367.7 million design-build contract for the Monroe Connector/Bypass to Monroe Bypass Constructors, a join ...

4 October2011

UIG Participates in "Immediate Needs Drive".

Summer 2011 LOR Immediate Needs Drive:

In an effort to give back to our community, all UIG offices and affiliated companies participated in an "Immediate Needs Drive" to benefit the Lowcountry Orphan Relief (LOR) facility. ...

1 September2011

US 78 Bridge Replacement over Edisto River

United Contractors is replacing the US 78 bridge over Edisto River near Branchville, SC. This project consists of replacing three bridges over the Edisto River and overflows. The two overflow bridges are 240' flat slab on concrete piles and the ma ...

See All News