Southern Connector Public Private Partnership

Toll facility with 45 bridges along new 17-mile four-lane grade-separated divided highway with 2 major interchanges, 3 railroad overpasses, and numerous river/stream crossings and grade separations totaling 11,000 LF and 590,000 SF of bridges. Contract scope included final corridor studies and route alignment, public hearings, environmental documentation, right-of-way acquisition, utility relocation, public relations, design, construction, operations, and maintenance. Project was delivered ahead of schedule in just 27 months for a lump sum without any claims or disputes.

 

See All Projects

News

23 November2011

Monroe Connector/By-Pass Design-Build Contract Signed

RALEIGH — NCDOT Transportation Secretary Gene Conti and Turnpike Authority Executive Director David Joyner today signed the $367.7 million design-build contract for the Monroe Connector/Bypass to Monroe Bypass Constructors, a join ...

4 October2011

UIG Participates in "Immediate Needs Drive".

Summer 2011 LOR Immediate Needs Drive:

In an effort to give back to our community, all UIG offices and affiliated companies participated in an "Immediate Needs Drive" to benefit the Lowcountry Orphan Relief (LOR) facility. ...

1 September2011

US 78 Bridge Replacement over Edisto River

United Contractors is replacing the US 78 bridge over Edisto River near Branchville, SC. This project consists of replacing three bridges over the Edisto River and overflows. The two overflow bridges are 240' flat slab on concrete piles and the ma ...