Del Webb Sun City Bridge

United Infrastructure group projects

2009

Project Overview

Project Type

New Bridge

Location

Sun City, SC

Owner/Client

SCDOT

Project Start
Project Completion
Sun City Bridge Construction in SC

Total Hours Worked

Project Value

Project Size

Del Webb Sun City Bridge

Project Photo Gallery

Project Details

This design-build project required the design, construction, and quality assurance of a new 230′ 4-span bridge over US 278 along with new roadway approaches and enhancements. The superstructure was comprised of 34′ reinforced concrete flat slab end spans, 2 – 81′ continuous interior spans with 48″ x 42″ prestressed concrete box beams, precast concrete fascia arch panels with a full brick veneer and precast artwork insets. The substructure consisted of reinforced concrete piers on 18″ prestressed concrete piles with concrete block and brick veneer surrounding all of the substructure components. Other aesthetic enhancements included faux guard houses at opposing corners, structural ornate aluminum railing, reinforced brick posts with precast concrete caps, and various precast concrete accent and artwork panels. The design and construction of the project was completed in approximately one year, including all approach work, landscaping, and lighting.
View Our

Recent Projects

We’ve been doing this a while, so we have quite a bit to show for it. View all projects or check out one of our latest below.

Questions for us?

Contact The UIG Team Today!

UIG is your trusted partner for bridge and highway construction, maintenance, painting, demolition, expansion, replacement, and rehabilitation in NC, SC, and GA. We proudly serve Charleston, Spartanburg, Fletcher, Charlotte, Lancaster, Orangeburg, and others in these states. Contact the UIG team today. Let’s build stronger bridges and highways together!