[cs_content][cs_element_section _id=”1″ ][cs_element_row _id=”2″ ][cs_element_column _id=”3″ ][cs_element_headline _id=”4″ ][cs_element_gap _id=”5″ ][cs_element_line _id=”6″ ][cs_element_gap _id=”7″ ][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”8″ ][cs_element_row _id=”9″ ][cs_element_column _id=”10″ ][cs_element_gap _id=”11″ ][cs_element_headline _id=”12″ ][cs_element_gap _id=”13″ ][cs_element_line _id=”14″ ][cs_element_gap _id=”15″ ][cs_element_text _id=”16″ ][cs_element_gap _id=”17″ ][/cs_element_column][cs_element_column _id=”18″ ][cs_element_gap _id=”19″ ][cs_element_headline _id=”20″ ][cs_element_gap _id=”21″ ][cs_element_content_area_modal _id=”22″ ][/cs_element_column][/cs_element_row][/cs_element_section][cs_element_section _id=”23″ ][cs_element_row _id=”24″ ][cs_element_column _id=”25″ ][cs_element_global_block _id=”26″ ][/cs_element_column][/cs_element_row][/cs_element_section][/cs_content]

United Contractors is replacing the US 78 bridge over Edisto River near Branchville, SC. This project consists of replacing three bridges over the Edisto River and overflows. The two overflow bridges are 240′ flat slab on concrete piles and the main bridge is 1200′ Bulb Tee Girder river bridge on drilled shafts. Construction of these bridges began in February of 2010 and is on schedule to be completed in August of 2012.