Miller Road Bridge over Shot Pouch Branch Replacement

United Infrastructure group projects

2026

Project Overview

Project Type

Bridge Replacement

Location

Sumter County, South Carolina

Owner/Client

South Carolina Department of Transportation (SCDOT)

Project Start
Project Completion

2026-10-01

Miller Road Bridge over Shot Pouch Branch Replacement 1

Total Hours Worked

Project Value

Project Size

Miller Road Bridge over Shot Pouch Branch Replacement

Project Photo Gallery

Project Details

United Infrastructure Group successfully completed the full removal and replacement of the Miller Road Bridge over Shot Pouch Branch in Sumter County, South Carolina. Originally constructed in 1957, the legacy structure was closed after reaching the end of its service life due to structural and functional deficiencies.

To restore this vital local corridor, UIG constructed a modern flat-slab bridge engineered for enhanced structural capacity, extended service life, and improved hydraulic performance. The project upgraded regional mobility and safety by re-establishing a critical crossing for local commuters, emergency services, and freight traffic—delivering the completed bridge to SCDOT and the local community ahead of its original November 1, 2026 contract deadline.

Key Highlights & Scope of Work:
Bridge Substructure & Superstructure: Demolished the original 1957 structure and constructed a high-durability concrete flat-slab bridge designed to modern AASHTO and SCDOT load standards.

Enhanced Multi-Modal Access: Integrated dedicated pedestrian sidewalks, curb and gutter, and expanded shoulders across the bridge deck and approach spans to improve pedestrian safety.

Roadway & Corridor Upgrades: Graded, prepared, and resurfaced the approach roadways with high-performance asphalt pavement, complete with updated permanent markings and crash-worthy guardrail assemblies.

Hydraulic & Erosion Control: Installed updated drainage structures and placed heavy riprap armoring along the stream banks of Shot Pouch Branch to protect against scour and long-term bank erosion.

Accelerated Project Delivery: Optimized field sequencing across deck pours, approach paving, and site finishing to open the roadway to traffic safely ahead of schedule.

View Our

Recent Projects

We’ve been doing this a while, so we have quite a bit to show for it. View all projects or check out one of our latest below.

Questions for us?

Contact The UIG Team Today!

UIG is your trusted partner for bridge and highway construction, maintenance, painting, demolition, expansion, replacement, and rehabilitation in NC, SC, and GA. We proudly serve Charleston, Spartanburg, Fletcher, Charlotte, Lancaster, Orangeburg, and others in these states. Contact the UIG team today. Let’s build stronger bridges and highways together!

Translate »